| A plastic water butt re-modeled to make a link between the floor of the loo and the metal container below. Adding some sealant made a good join. | 
| The floor of the loo - re-enforced and a hole cut ready. The floor was also coated with varnish. | 
| Temporarily propping things up - just to get things level. | 
| The view down the hole to the earth below! | 
| Offering up the bucket that is going to have the toilet itself built around and act as a chute to the container below. | 
| Some stonework added to stop the foot from slipping and add support to the piece of wood that the step is going to rest upon. | 
| Green paint going on, but still lacking a proper roof covering. | 
|  | 
| Roofing felt being added. | 
| Roofing felt and trim added. | 
| Almost finished! Still lacking a front step and a window. | 
| Loo seat in position on a wooden fame over the bucket acting as a chute to the metal container below. There is a 'T' shaped support at the back of the toilet that is not shown in this picture. | 
| The loo seat is one of the few items used in the build not re-cycled or leftover from previous projects. | 
| Window installation. | 
| Cupboard made from re-cycled bits and pieces. | 
| Door catch. | 
| The view from the window! | 
Final finishing touches needed:
- A step to make access easier.
- Guttering and a water butt.
- A way of hooking the door open for ventilation!
- A bucket of sawdust and some instructions.
- A place for hand washing.
